Cartoon ride from Fremont East toward Kyle CanyonA shuttle bus leaves the bus-to-the-dirt depot and climbs a road toward the ramp. The bus ride to the dirt trail is 30 minutes from the city. Two e-bikes ride the dirt.BUS TO THE DIRTThe RampeTRAIL

Startup raise

Hop the bus near Fremont. Ride dirt on the way to Kyle Canyon.

Kyle eTrail is raising $2,000,000 to open an e-bike trail partway up Kyle Canyon Road. The bus ride from the city to the dirt trail is 30 minutes.

Funding goal

$2,000,000

For the trail, the e-bike fleet, and the buses that leave near Fremont.

Mission

A safe alternative to the street

This nonprofit was formed in honor of the youth of Las Vegas who have lost their lives riding e-bikes on the street. Our mission is to provide a safe alternative for the use of these bikes.

Pricing

Tickets are à la carte

Buy only the piece you need. A bus ticket, a bike ticket, and a trail ticket are separate. Memberships are optional and are not charged from this page.

  • Bus ticket

    $5

    A seat on the shuttle from near Fremont Street out to the dirt.

  • Bike ticket

    $25

    An e-bike for the visit, checked out at the station.

  • Trail ticket

    $15

    A pass on the dirt loops off Kyle Canyon Road.

Memberships

  • Power+

    $200/year

    An extra hour in the morning and an extra hour at closing, plus 10% off all food.

  • Power

    $40/month

    Basic hours, with no food discount. Bus, bike, and trail tickets are covered for the month.

Funding goal · $2,000,000

Trail construction, an e-bike fleet, and buses from Fremont East to the dirt. The ride is 30 minutes from the city.

Welcome

Welcome to the mountain

Welcome. Here in Las Vegas, beautiful mountains and open terrain are ready to be explored.

On our tour we take you to private desert land on the way to the mountain. You get wide views and the best outdoor exercise — a ride that leaves the valley and puts you on dirt with the peaks in front of you.

This dream is in the works. Contribute, and your name, or your business if you file the gift as Org, is added to the ramps being built as a thank-you for your support.

The ride

Three beats from the canopy to the dirt

1

Fremont East Depot

The pickup is planned a short walk from the Fremont Street Experience, on the east end of Fremont Street in downtown Las Vegas. Riders check a bag, grab a helmet ticket, and board a painted shuttle. First bus at 8:00 a.m., then every hour until 3:00 p.m.

2

Thirty minutes from the city

The bus takes US-95 north, then turns onto Kyle Canyon Road. The ride from the city to the dirt trail is 30 minutes. Desert scrub gives way to pinyon and pine, and the air cools as the road climbs.

3

The Ramp

This is where everyone gets off the bus and rides the bikes. The ramp is on Kyle Canyon Road. E-bikes are charged and waiting, the dirt starts here, and the last bus down is planned for 5:40 p.m.

Buses up
Hourly, 8:00 a.m. to 3:00 p.m.
On the dirt
A ride window through the afternoon
Last bus down
5:40 p.m. from the ramp

That rhythm is the opening-day plan, for after the trail is permitted and built. Nothing is running yet.

A day on Kyle eTrail

Four panels, one mountain bus

FREMONT
Board near Fremont
NV-157
Climb Kyle Canyon Road
Ride the dirt
FREMONT
✦✦
HOME
Bus home before dark

The dirt

Ridge

The Ramp sits at the end of the ride on Kyle Canyon Road, where the pines have taken over.

The Ridge dirt track, with berms and jumps shaped in the soil.

Ridge

Advanced

Shorter and steeper, with rock rolls and a look back across the valley.

The route

Close to Fremont in the morning. Trails before lunch.

Customers walk to a depot near Fremont Street. The bus climbs out of the valley on US-95 and turns onto Kyle Canyon Road. The bus ride to the dirt trail is 30 minutes from the city. That road is the end of the ride.

Story map from Fremont East to the end of Kyle Canyon RoadDowntown to the dirtStory map, not a survey. Kyle Canyon Road is the end. 30 minutes from the city.Fremont EastBus depotUS-95 northOut of the valleyKyle Canyon Road30 min from the city

Before you board

Questions the pitch should answer

Is the trail open?+

Not yet. This page is the startup pitch. The $2 million is what it takes to permit, build, and open the dirt, the bike fleet, and the buses.

Where do I catch the bus?+

At a planned depot close to Fremont Street in downtown Las Vegas, on the east end, a short walk from the Fremont Street Experience canopy. Riders downtown walk over. The bus does the mountain part.

Where is the dirt, exactly?+

On Kyle Canyon Road. The bus ride from the city to the dirt trail is 30 minutes, after the turn off US-95. You do not ride the highway, and you do not have to go all the way to the summit.

Why e-bikes?+

The climb out of the valley is real. Pedal-assist lets a mixed group leave the bus and still finish a loop before the ride home. The bikes share $1,035,000 with the buses and the equipment. The two places they use are budgeted on their own: $850,000 on the way to Kyle Canyon, and $115,000 for the station.

Where is the $2 million split?+

On the donations page. The goal covers the Kyle Canyon bike location, the station, and the buses, bikes, and equipment. Donate in the header opens that page.

What about snow?+

Kyle Canyon Road can demand chains or close in winter. The season is planned for the months the road is clear, with spring and fall as the heart of it. This is dirt and e-bikes, not the ski hill farther up.